عن rami shamsalden:
I am telecommunications engineer amI leave in kuwait
الخبرة
SHABAKKAT company Saudi Arabia – Jeddah - Rented
to Ericsson
I worked as Maintenance Engineering ERICSSON
and Front office Access managed service. Till 31 May
2019.
❖ Fo Access
➢ Checking all alarms and minoring site By Cetrix
and NSN, NETECO, HUAWEI.
Open TTs Flowing contractors, open MDT, TCN, cutover,
…ex.
➢ Checking all Activity in BCM Remedy to confirm
Activity Approval
❖ PMR &CM
➢ We do on a regular basis on the devices to reduce
the likelihood of that failure. Preventive
maintenance is performed while the equipment is
still working, so they do not break down
unexpectedly, higher performance reports Trouble
shooting
Software. Configuration all Ericsson Equipment
DUG, DUS.DUW, SIU, MW
Hardware.
Checking all indoor & outdoor technology,
replace & swap spare, VSWR, POWER
❖ PAT
➢ Check & test new ore expiation site from roll out
to handle over
Quality Assurance Engineer
➢ Conduct audits, including closing out audit
findings, creating audits finding reports and
determine proper corrective and preventive
actions
➢ Checking maps and secure a good future vision
before the project is approved
➢ Follow‐up meetings project with Vander & sub-
contractor vision and listen to the instructions
provided Vander to the companies and the extent
of their understanding contractor Safety
discussion situation according to the type
environment for the type of wire used in the
Ground.
➢ perfect analyzer for after installation testing and
acceptance for all telecom equipment in both
software and hardware.
➢ can work with many telecom equipment and
measure devices such as (site master , OTDR, E1
Tester).
➢ Carry out on site approval of acceptance
processes as per MTN standards
Feb 2010 –
Jun 2013
First Link Communication – Khartoum, Sudan:
❖ projects coordinator / Site Engineering:
Project Targets:
Modernization Project in Sudan (Project of: Sites Swap and
MTN)
➢ Swap all old BTS of different venders in several cities is
Sudan to ZTE BTS Modernization all indoor sites to
outdoor (Dismantle shelter and AC) to reduce power
consumption
➢ MTN , Ericsson 3G (Madani & Portsudan) ▫ Follow up
services teams working on field.
➢ Follow up Materials delivery
➢ Installation ZTE equipment ( wireless & transmission ).
➢ Installation and commissioning and testing (TN ,MNLE.
➢ Ericsson , HUAWEI RTN, ZTE Links).
➢ Installation & upgrade all HUAWEI BTS (CDMA, WCDMA &
GSM).
➢ Installation all type of Rectifier & connected all most of power
in the site.
➢ Installation BTS APM30 HUAWEI Hybrid power system
solution.
➢ swapping from Alcatel to HUAWEI BTS & MW LINK.
➢ swapping from Siemens to HUAWEI BTS &MW LINK.
➢ swapping& Modernization from ERICSSON & Alcatel TO ZTE
(BTS & LINK)
التعليم
Feb 2011: B.Sc. Degree in Electronic Engineering (Honors)
El Mashreq Collage for Sciences and Technology – Khartoum, Sudan
