COMPANY NAME:  HOUSE OF TRADE ENGINEERING CO.

POSITION:                MAINTENANCE INSTRUMENT TECHNICIAN

PROJECT NAME:     MINA ABDULLAH REFINERY (KNPC) KUWAIT.

DATE:                       APRIL 10, 2018 UP TO PRESENT.

 

COMPANY NAME:  KHARAFI NATIONAL.

POSITION:                MAINTENANCE INSTRUMENT TECHNICIAN

PROJECT NAME:     MINA ABDULLAH REFINERY (KNPC) KUWAIT.

DATE:                       JULY 10, 2014 TO APRIL 10, 2018

 

COMPANY NAME:  MIDONG PHILIPPINES CON CORP.

PROJECT NAME:     RMP-2 PROJECT, LIMAY BATAAN PHILIPPINES.

DURATION DATE:   JUNE 28, 2013 TO JUNE 15 2014

 

COMPANY NAME:   KUMYANG ELECTRIC CO LTD

POSITION:                 INSTRUMENT TECHNICIAN

PROJECT NAME:      ENTER REFINERIES PIPELINE PROJECT TACKREER ABHUDABI U.A.E.

DURATION DATE:    MAY 2012 TO MAY 2013

 

COMPANY NAME:   MOHAMMAD AL-MOJIL GROUP

POSITION:                 INSTRUMENT TECHNICIAN

PROJECT NAME:      JUAYMAH GAS PLANT EXPANSION PROJECT SAUDI ARAMCO

DURATION DATE:    NOVEMBER 2007 TO DECEMBER 2009

 

COMPANY NAME:  MOHAMMAD AL-MOJIL GROUP

POSITION:                INSTRUMENT TECHNICIAN

PROJECT NAME:     SHARQ 3RD EXPANSION PROJECT U&O JUBAIL INDUSTRIAL CITY

DURATION DATE:   FEB 05, 2009 TO DEC 30, 2009

 

COMPANY NAME:  MOHAMMAD AL-MOJIL GROUP

POSITION:                INSTRUMENT TECHNICIAN

PROJECT NAME:     NCP/JGC NORTH OLYFINS PROJECT SAUDI POLYMERS

DURATION DATE:   MAY 20, 2010 TO APRIL 30, 2011

 

COMPANY NAME:  MOHAMMAD AL- MOJIL GROUP

POSITION:                INSTRUMENT TECHNICIAN

PROJECT NAME:     NCP/WORLEY PARSON SAUDI POLYMERS

DURATION DATE:   MAY 08, 2011 TO JULY 30, 2011

 

 

SUMMARIES OF DUTIES:

 

 

  • Currently work in workshop as bench calibrator of transmitter, gauges, switches.
  •  Testing and replacing of defective electronics components
  • Responsible for operation and maintenance and monitoring of all industrial machineries.
  • Performed in safe and efficient manner to established industry standard.
  • Experience in diagnosing and determining the best of method to install, repaired calibrate process control instrument. 
  • Performed actual trouble shoots in field instruments and a large control panel.
  • Matching the actual level of the process in level glass to monitoring system, and conduct leak filling and commissioning of level transmitter
  • Conduct in field calibration of instrument and control valves. 
  • Monthly activities such as preventive maintenance in water jet pump, decoking valve and conduct functional testing.
  • Performed field calibration of instrument and commissioning during shutdown.
  • Have knowledge calibrate and repair control valves.
  • Conduct corrective and preventive maintenance calibration during shutdown jobs. GRTA interlock checking and plant startup.
  • Carried out of loop checking continuity test of primary and secondary cables.
  • Dismantling and installation of vibration probe and adjustment of gap voltage, thermocouple magnetic pickup unit in water jet pump and any compressors.
  • Have a knowledge in fire and gas system installation and pre- commissioning 
  • Installation of stainless steel impulse tubing and support. Installation of stanchion transmitters, junction box, grounding cable.
  • Termination in marshaling cabinet, local panel, junction box, such as internal cross wiring and to all kinds of instrument and system
  • . Exhibited safe tube bending and connection techniques using various sizes of stainless steel tubing for instrumentation; single and multiple tubing lines. Applied mathematical aptitude to ensure an accurate radius measurement for tube bending.
  •  Installation of all instrument based on standard’s details’ hook up drawing, location drawing should it be follow the plans base on P&ID, ILD; AND termination drawing, cable schedule , cable routing drawing; cable tray routing drawing.
  • Loop checking of close loop and open loop procedure.
  • Involved in pre commissioning and commissioning activities cross checking P&ID’s punch list witness and review calibration of field instrument.
  • Performed valve stroking and functional testing of control valves machineries involved in instrument.
  • QA/QC assistant during inspection of instrument and tracker in punch clearing.
  • Vendor supply and conduct functional testing and loop checking of instrument vendor side
  • Conduct zero checking on field instrument and zero adjustment.

 

التعليم

Year: June 2004 to March 2006:  Associate in Electronics Technology

Name of school: Limay Polytechnic College. 

Address: Limay Batan Philippines

 

 

محترفون من نفس قطاع مرافق / طاقة مثل Carlito Acosta

محترفون من قطاعات مختلفة بالقرب من Kuwait City, مُحَافَظَة اَلْعَاصِمَة